5 016 000* uah
119 000 $ (1$=42.15 uah)
113 000 € (1€=44.25 uah )

In the house: a warm floor on the first floor and in the bathroom on the second floor, a boiler, two installations installed, heating on the second floor, everything is ready for installing radiators (radiators are available), the distribution of electricity throughout the house has been made according to the design project . Drilled a well, made a septic tank, sewage system, installed a pump. There is an electric boiler, everything is prepared for its installation. All rehau windows are energy



updated: 17.12.2024

Number of views in last 30 days : 9